FLOORING - PREPARATION, INSTALLATION AND FINISHING

Flooring works for renovations, professional buildings and structured projects.

CityPro defines the substrate, installation system, quantities, interfaces and finishes before pricing. The selected floor finish is paired with the preparation required by the project.

Substrate preparationParquet, vinyl/SPC and tilingCityPro BV as contractual counterpart
Herringbone parquet in a CityPro project
Herringbone parquet - CityPro project
ENTITYCityPro BV · BE 0724.849.722
PROJECT FILEPhotos, drawings, BOQ and specifications welcome
CONTACTinfo@citypro.be - one entry point

SCOPE OF WORK

A flooring package defined from substrate to finish.

We separate substrate preparation, floor finish and perimeter details so level, moisture or interface issues are not discovered too late.

01

Preparation and levelling

Substrate checks, local corrections, levelling and preparation required before installation.

02

Parquet and timber floors

Installation of parquet or timber flooring according to the selected system, including underlay, interfaces and skirting where specified.

03

Vinyl and SPC

Installation of vinyl or SPC finishes, including layout and perimeter details according to the project file.

04

Floor tiling

Installation of floor tiles in defined areas including preparation, cutting, grouting and interfaces.

FIELD EVIDENCE

Floor finishes visible in CityPro projects.

The images below show floors delivered in CityPro projects. Substrate, installation system and finishing are defined for each project file.

Parquet in a renovated CityPro space
Parquet in a renovated space
Tiled floor and finishing
Tiled floor and finishing

PROJECT FIT

Reliable pricing starts with the substrate and floor areas.

Pricing is more reliable when the substrate, areas, intended finish and interfaces are identified.

Suitable project files

  • Renovations with a defined flooring package
  • Offices, retail or professional buildings
  • Houses and apartments with meaningful floor areas
  • Drawings, quantities or finish references available

Useful information at the start

  • Area per floor finish
  • Condition and type of substrate
  • Preferred reference or product range
  • Skirting, profiles, thresholds and interfaces

METHOD

From substrate to finished floor, with interfaces checked.

Preparation is confirmed before installation to reduce rework and incompatibilities.

01

Project file

Areas, substrates, references and available documents.

02

Review

Check installation system, preparation and interfaces.

03

Verification

Targeted site check if level, moisture, substrate or access must be confirmed.

04

Quotation

Structured scope for preparation, flooring and finishes.

PROJECT FILE

Submit the flooring package.

Provide the areas, substrate and intended floor finish. We then identify the checks that are actually needed.

✓ Photos / drawings / BOQ if available✓ Approximate area is enough to start✓ Qualification before site visit
STEP 1 OF 2

Submit the flooring package.

This information is used to qualify the work package. It is not a quotation or a programme confirmation.

STEP 2 OF 2

Project file and contact details

Only attach documents useful for the review. Do not send unnecessary sensitive data.